BuildMap
Loading…
Loading, please waitPreliminary estimates for materials, budgets and planning — with every formula, assumption and rate shown transparently. Final quantities must follow approved drawings and professional advice.
Flagship end-to-end estimate: cost, work-head breakup, stage budget and indicative materials.
Enter your built-up area, city and quality tier to get a preliminary construction budget with work-head breakup, stage-wise budget and indicative material quantities.
Used for plumbing assumptions.
Used for plumbing assumptions.
Leave 0 to use the BuildMap rate for your city & quality.
Includes 5% contingency of ₹ 97,500.
BuildMap Rate Master — Other (National Avg), Standard (effective 2026-07-19)
Shown transparently — verify against local market quotes.
| Work head | % | Amount |
|---|---|---|
| Structure & RCC | 32% | ₹ 6,24,000 |
| Masonry / Plaster | 12% | ₹ 2,34,000 |
| Flooring | 9% | ₹ 1,75,500 |
| Doors / Windows | 8% | ₹ 1,56,000 |
| Plumbing / Sanitary | 8% | ₹ 1,56,000 |
| Electrical | 8% | ₹ 1,56,000 |
| Painting / Finishes | 8% | ₹ 1,56,000 |
| Waterproofing | 3% | ₹ 58,500 |
| Other works / Labour / Overheads | 12% | ₹ 2,34,000 |
| Stage | % | Amount |
|---|---|---|
| Foundation / Plinth | 12% | ₹ 2,45,700 |
| RCC / Superstructure | 28% | ₹ 5,73,300 |
| Masonry / Plaster | 15% | ₹ 3,07,125 |
| MEP (Electrical / Plumbing) | 15% | ₹ 3,07,125 |
| Flooring / Joinery | 15% | ₹ 3,07,125 |
| Painting / Finishing | 15% | ₹ 3,07,125 |
| Material | Quantity | Cost |
|---|---|---|
| Cement | 400 bags | ₹ 1,60,000 @ ₹400 INR/bag |
| TMT Steel | 4,000 kg | ₹ 2,48,000 @ ₹62 INR/kg |
| Sand | 1,800 ft³ | ₹ 99,000 @ ₹55 INR/ft³ |
| Aggregate | 1,350 ft³ | ₹ 81,000 @ ₹60 INR/ft³ |
| Clay bricks | 8,000 nos | ₹ 64,000 @ ₹8 INR/no |
The 13 core estimators plus planning tools for materials, budgets and layouts.
Every result shows its formula basis, assumptions and the rate/coefficient version used.
Rates and coefficients come from an admin-editable master — never hard-coded in formulas.
Planning figures only — final quantities follow approved drawings and professional advice.